FILE NO. VMC/DWG/2024/NCR-001  ·  SECTION: GENERAL AWARENESS
NON-CONFORMANCE

UNCIVIL
ENGINEER

An interactive satire on infrastructure, bureaucracy, and engineering reality.

Research is 500 years ahead of practice.

Welcome to the gap.

M40 specified (IS 456:2000 Cl. 6.1).  M10 delivered.  Inquiry pending.

You are the engineer of record. Good luck.

RECORDS MAINTAINED SINCE APPROXIMATELY 1973. ACCURACY NOT GUARANTEED.

VIKASNAGAR — BY THE NUMBERS

SOURCE: VARIOUS. RELIABILITY: APPROXIMATE.

~40%

Fire NOCs Issued After Occupancy

NBC 2016 Part 4 requires prior approval. 'Prior' means different things here.

Unknown

Workers Paid Minimum Wage

Minimum Wages Act 1948. Unenforced since 1948.

Rarely

Mill Certificates Verified At Site

IS 2062:2011 mandates traceability. Tracing leads to a very good printer.

~15%

Building Plans Matching Actual Construction

Approved: G+2. Built: G+5 with basement. Regularised: eventually.

0.7

Engineers Per 1 Lakh Population

Sanctioned: 2.1. Filled: 0.7. Remaining 1.4: 'under recruitment since 2018.'

Ask the CAG

Seismic Zone III Structures With Zone II Design

IS 1893:2016 Cl. 6.4.2 exists. Enforcement: seasonal.

The contractor's 'mobilization advance' has been mobilized. The contractor has not.NBC 2016 Part 4: fire exit width 1050mm minimum. Actual: 750mm. Through a kitchen.The measurement book is an anthology of creative writing.VALUE ENGINEERING: the technical term for 'we spent the budget on tender negotiations'Tender eligibility criteria fitted to one firm is not competition. It is casting.There are more codes than engineers who have read them.ASCE 7-22 §11.4 defines seismic forces. IS 1893:2016 Cl. 6.4 defines them again. Structures ignore both.IS 456:2000 Cl. 15.1 recommends periodic inspection. 'Periodic' = once, at commissioning, by the contractor.The road broke because it rained. The bridge fell because of a truck. The inquiry continues.IS 800:2007 on steel connections. IS 456 on concrete. IS 875 on loads. Site: 'noted'.The contractor's 'mobilization advance' has been mobilized. The contractor has not.NBC 2016 Part 4: fire exit width 1050mm minimum. Actual: 750mm. Through a kitchen.The measurement book is an anthology of creative writing.VALUE ENGINEERING: the technical term for 'we spent the budget on tender negotiations'Tender eligibility criteria fitted to one firm is not competition. It is casting.There are more codes than engineers who have read them.ASCE 7-22 §11.4 defines seismic forces. IS 1893:2016 Cl. 6.4 defines them again. Structures ignore both.IS 456:2000 Cl. 15.1 recommends periodic inspection. 'Periodic' = once, at commissioning, by the contractor.The road broke because it rained. The bridge fell because of a truck. The inquiry continues.IS 800:2007 on steel connections. IS 456 on concrete. IS 875 on loads. Site: 'noted'.